|
Shenhua CTL (also known as Ningxia Hui CTL, (中国語:神华CTL)) is a planned coal liquefaction plant in Ningdong, Ningxia, China. Its planned capacity is .〔〔 〕 The liquefaction plant is to use a Sasol's indirect liquefaction technology, based on the Fischer–Tropsch process. The feasibility study was carried out by Foster Wheeler and Wuhuan Engineering.〔 〕〔 〕 The constriction is to start in October 2010 and it expected to cost US$7 billion.〔 〕 The project was developed by Sasol and Ningxia Coal Industry Group, a subsidiary of Shenhua Group.〔〔 The agreement between companies was signed on 21 June 2006.〔 〕 In September 2011, Sasol pull back from the project.〔 Shenhua completed the construction and has started up the CTL plant. 〕 ==See also== * Erdos CTL 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Shenhua CTL」の詳細全文を読む スポンサード リンク
|